Rewa – Sidhi new BG Rail Line Project Two Pocket Systems

• Ongoing •

Project Progress

Overall Completion 0%

Current Work

Construction of

  • Tunnel No 02 Ch: 78333 m to 78625m
  • Tunnel No 03 Ch: 81622 m to 82096.90m
  • Tunnel No 04 Ch: 83184.625 m to 83461.95m (Approximate length 1044.20 RM) etc.
  • Excluding Ch: 79400 m of Sone Bridge

Rewa – Sidhi new BG Rail Line Project Two Pocket Systems

Project Overview

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since 1966, when designers at Letraset and James Mosley, the librarian at St Bride Printing Library in London.

Project Gallery