Tunnel & Concrete Works – Pune–Miraj Doubling Project, Wathar–Koregaon, Dist. Satara (MH)


Final lining Completed and handed over of tunnel

Contract Value 26Cr
Main Client/Contractor
Year
• •

Construction of 04 Nos. minor bridges and retaining wall at mention location between Rampur Naiken-Churhat section


Construction of 04 Nos. minor bridges and retaining wall at mention location between Rampur Naiken-Churhat section through existing contract agreement WCR/WCRC/Civil/2024/0017 dated 16/04/2024 in Sidhi- Gajrahi section in connection with Sidhi-Singrauli new BG rail line project. Minor bridges and retaining wall at mention location between Rampur Naiken-Churhat section

Contract Value 15 Cr
Main Client/Contractor
Year
• •

TUNNEL AND CONCRETE WORKS – REWA – SINGRAULI NEW BG LINE, BHAGWAR, DIST- REWA (MP)


CONSTRUCTION of BG single line underground Railway Tunnel No. 1 for an approximate length of 2050m (about 1540m underground tunnel and 510m of open cut and earthwork) in Hard Rock/Soil including cut and cover portion, portal wall, earth work formation on approaches of tunnel, minor bridge, Side/catch water drains and other miscellaneous work.  

Contract Value 62Cr
Main Client/Contractor
Year
• •

EXECUTION OF TUNNEL & CONCRETE WORKS(CHURAHAT TO SIDHI) REWA SINGRAULI NEW BG RAIL LINE RAMPUR NAIKIN DIST.SIDHI M.P


Construction of Tunnel No 02 Ch: 78333 m to 78625m, Tunnel No 03 Ch: 81622 m to 82096.90m and Tunnel No 04 Ch: 83184.625 m to 83461.95m (Approximate length 1044.20 RM) etc. Excluding Ch: 79400 m of Sone Bridge in between Churhat- Sidhi stations of Rewa – Sidhi new BG Rail Line Project. Two Pocket…

Contract Value 103Cr
Main Client/Contractor
Year
• •

REWA – SINGRAULI NEW BG RAIL LINE AMARWHA DIST. SIDHI M.P


Extension of Portal at Tunnel No.03 (Portal 02) Through construction of Cut & Cover.

Contract Value 15 Cr
Main Client/Contractor
Year
• •

Badewadi, Wakurde L.I. Project, Tal. Shirala (Sangli)


Tunnel Excavation – Badewadi, Wakurde L.I. Project, Tal. Shirala (Sangli)

Contract Value 1.32Cr
Main Client/Contractor Parawani Builders Pvt. Ltd., Pune (MKVDC)
Year Oct 2000– Aug 2002
• •

Polwadi– Dhom Balkawadi L.I. Project, Tal. Bhor (Pune)


Tunnel Excavation, Lining & Guniting – Polwadi– Dhom Balkawadi L.I. Project, Tal. Bhor (Pune)

Contract Value 1.90Cr
Main Client/Contractor Shankara Ramchandra Earthwork Pvt. Ltd., Pune
Year Sep 2003– Oct 2005
• •

Badhevadi, Wakurde L.I. Project, Tal. Shirala (Sangli)


Tunnel, Shotcrete & Lining Works – Badhevadi, Wakurde L.I. Project, Tal. Shirala (Sangli)

Contract Value 2.30Cr
Main Client/Contractor Parawani Builders Pvt. Ltd., Pune (MKVDC)
Year Dec 2004– Feb 2005
• •

Kharedawangi, Tembhu L.I. Project, Tal. Kadegaon (Sangli)


Tunnel & Concrete Works – Kharedawangi, Tembhu L.I. Project, Tal. Kadegaon (Sangli)

Contract Value 2.07Cr
Main Client/Contractor Maytas Infra Pvt. Ltd., Hyderabad (MKVDC)
Year Oct 2006–Jan 2007
• •

Kumbha Hydro Project, Mangaon (Raigad)


Road Tunnel Excavation – Kumbha Hydro Project, Mangaon (Raigad)

Contract Value 1.66Cr
Main Client/Contractor Aryan Pandhe Construction Pvt. Ltd., Pune
Year Dec 2006– Aug 2007
• •

Man, Tal. Khatav (Satara)


Tunnel, Deep Cut & Canal Works – Man, Tal. Khatav (Satara)

Contract Value 9.32Cr
Main Client/Contractor SMS Infrastructure Ltd., Nagpur
Year Aug 2007– 2009
• •

Wakurde L.I. Project, Tal. Shirala (Sangli)


Tunnel Concrete & Shotcrete – Wakurde L.I. Project, Tal. Shirala (Sangli)

Contract Value 2.00Cr
Main Client/Contractor Honai Construction, Pune
Year Sep 2007– Dec 2008
• •

Tembhu Power Project, Tal. Karad (Satara)


Tunnel Excavation – Tembhu Power Project, Tal. Karad (Satara)

Contract Value 1.80Cr
Main Client/Contractor T.D.D.L. Company, Pune
Year Feb 2008– Mar 2009
• •

Kumbhe Hydro Project, Tal. Mahad (Raigad)


Tunnel Excavation – Kumbhe Hydro Project, Tal. Mahad (Raigad)

Contract Value 3.20Cr
Main Client/Contractor F.A. Construction Engineers & Contractor, Mumbai
Year Feb 2008–Oct 2010
• •

Arjuna L.I. Project, Panchal, Tal. Rajapur (Ratnagiri)


Tunnel Excavation – Arjuna L.I. Project, Panchal, Tal. Rajapur (Ratnagiri)

Contract Value 2.30Cr
Main Client/Contractor P.C.C. Construction Co., Dodamarg (Sindhudurg)
Year Jun 2009– Dec 2010
• •

Urmodi L.I. Project, Man Village, Tal. Khatav (Satara)


Tunnel & Concrete Works – Urmodi L.I. Project, Man Village, Tal. Khatav (Satara)

Contract Value 3.50Cr
Main Client/Contractor SMS Infrastructure Ltd., Nagpur
Year Aug 2010– Dec 2011
• •

Takari L.I. Project, Tal. Tasgaon (Sangli)


Structure & Bridge Works – Takari L.I. Project, Tal. Tasgaon (Sangli)

Contract Value 1.60Cr
Main Client/Contractor Honai Construction, Pune
Year 2013–2014
• •

Pundi Project, Tal. Tasgaon (Sangli)


Pump House & Concrete Works – Pundi Project, Tal. Tasgaon (Sangli)

Contract Value 1.20Cr
Main Client/Contractor Laxmi Civil Engineers & Contractors, Kolhapur
Year Feb 2013– 2014
• •

Tembhu L.I. Project, KM 25–26, Tal. Vita (Sangli)


Tunnel Excavation – Tembhu L.I. Project, KM 25–26, Tal. Vita (Sangli)

Contract Value 2.10Cr
Main Client/Contractor P.V.R. Projects Ltd., Pune
Year April 2016
• •

Nagaj Tembhu L.I. Project, Tal. Kavatemahankal (Sangli)


Tunnel Excavation – Nagaj Tembhu L.I. Project, Tal. Kavatemahankal (Sangli)

Contract Value 3.15Cr
Main Client/Contractor Sanjay Kalbhor & Associates, Pune
Year Jul 2014–Oct 2015
• •

Tembhu L.I. Project, KM 21–22, Tasgaon (Sangli)


Tunnel Excavation – Tembhu L.I. Project, KM 21–22, Tasgaon (Sangli)

Contract Value 4.75Cr
Main Client/Contractor Sopan D. Patil & Mahesh K. Nikam, J.V. Kolhapur
Year 2014–15
• •

Tembhu L.I. Project, KM 23–26 Khanapur–Tasgaon Canal, Dist. Sangli (MH)


Tunnel & Structure Works – Tembhu L.I. Project, KM 23–26 Khanapur–Tasgaon Canal, Dist. Sangli (MH)

Contract Value 9.50Cr
Main Client/Contractor Prathamesh Construction, Miraj (Sangli)
Year 2010–13
• •

Wagshi–Nera Devaghar, KM 62–63, Tal. Khandala, Dist. Satara (MH)


Tunnel & Allied Works – Wagshi–Nera Devaghar, KM 62–63, Tal. Khandala, Dist. Satara (MH)

Contract Value 13.40Cr
Main Client/Contractor Prathamesh Construction, Miraj (Sangli)
Year 2010–13
• •

Bidur Gulbarga New BG Line, Margutti–Kamalapur, Dist. Gulbarga


Tunnel Execution – Bidur Gulbarga New BG Line, Margutti–Kamalapur, Dist. Gulbarga

Contract Value 36.00Cr
Main Client/Contractor SMS Infrastructure Ltd., Nagpur
Year 2014–17
• •

Red–Marlanathpur Wakude L.I.P., Tal. Shirala, Dist. Sangli (MH)


Tunnel Construction – Red–Marlanathpur Wakude L.I.P., Tal. Shirala, Dist. Sangli (MH)

Contract Value 5.00Cr
Main Client/Contractor Prathamesh Construction, Miraj (Sangli)
Year 2018–19
• •

Lift Irrigation Scheme, Tarali, Dist. Satara (MH)


Pump House & Concrete Works – Lift Irrigation Scheme, Tarali, Dist. Satara (MH)

Contract Value 5.18Cr
Main Client/Contractor Girija/Vandana Infrastructure Pvt. Ltd., Thane– Mumbai
Year 2019–20
• •

Pune–Miraj Doubling Project, Wathar–Koregaon, Dist. Satara (MH)


Tunnel & Concrete Works – Pune–Miraj Doubling Project, Wathar–Koregaon, Dist. Satara (MH)

Contract Value 24.60Cr
Main Client/Contractor Abir Infrastructure Pvt. Ltd., New Delhi
Year 2019–21
• •

Rewa–Singroli New BG Line, Bhagwar, Dist. Rewa (MP)


Tunnel & Concrete Works – Rewa–Singroli New BG Line, Bhagwar, Dist. Rewa (MP)

Contract Value 62Cr
Main Client/Contractor Abir Infrastructure Pvt. Ltd., New Delhi
Year 2019–22
• •

Execution of Tunnel & Concrete (Churhat to Sidhi)


Execution of Tunnel & Concrete (Churhat to Sidhi) – Rewa–Singroli New BG Rail Line, Rampur Naikin, Dist. Sidhi (MP)

Contract Value 103.00Cr
Main Client/Contractor SMS Infrastructure Ltd., Nagpur
Year 2020–24