TUNNEL AND CONCRETE WORKS – REWA – SINGRAULI NEW BG LINE, BHAGWAR, DIST- REWA (MP)

CONSTRUCTION of BG single line underground Railway Tunnel No. 1 for an approximate length of 2050m (about 1540m underground tunnel and 510m of open cut and earthwork) in Hard Rock/Soil including cut and cover portion, portal wall, earth work formation on approaches of tunnel, minor bridge, Side/catch water drains and other miscellaneous work.