EXECUTION OF TUNNEL & CONCRETE WORKS(CHURAHAT TO SIDHI) REWA SINGRAULI NEW BG RAIL LINE RAMPUR NAIKIN DIST.SIDHI M.P
Construction of Tunnel No 02 Ch: 78333 m to 78625m, Tunnel No 03 Ch: 81622 m to 82096.90m and Tunnel No 04 Ch: 83184.625 m to 83461.95m (Approximate length 1044.20 RM) etc. Excluding Ch: 79400 m of Sone Bridge in between Churhat- Sidhi stations of Rewa – Sidhi new BG Rail Line Project. Two Pocket Systems”
