Koderma Tileiya New BG Rail Line Tunnel Works At Rajauli Dist. Nawada Bihar
KODERMA TILEIYA NEW BG RAIL LINE TUNNEL WORKS AT RAJAULI DIST. NAWADA BIHAR
View ProjectKODERMA TILEIYA NEW BG RAIL LINE TUNNEL WORKS AT RAJAULI DIST. NAWADA BIHAR
View ProjectFinal lining Completed and handed over of tunnel
View ProjectCONSTRUCTION of BG single line underground Railway Tunnel No. 1 for an approximate length of 2050m (about 1540m underground tunnel and 510m of open cut and earthwork) in Hard Rock/Soil including cut and cover portion, portal wall, earth work formation on approaches of tunnel, minor bridge, Side/catch water drains and other miscellaneous work.
View ProjectConstruction of Tunnel No 02 Ch: 78333 m to 78625m, Tunnel No 03 Ch: 81622 m to 82096.90m and Tunnel No 04 Ch: 83184.625 m to 83461.95m (Approximate length 1044.20 RM) etc. Excluding Ch: 79400 m of Sone Bridge in between Churhat- Sidhi stations of Rewa – Sidhi new BG Rail Line Project. Two Pocket…
View ProjectExtension of Portal at Tunnel No.03 (Portal 02) Through construction of Cut & Cover.
View ProjectTunnel Excavation – Badewadi, Wakurde L.I. Project, Tal. Shirala (Sangli)
View ProjectTunnel Excavation, Lining & Guniting – Polwadi– Dhom Balkawadi L.I. Project, Tal. Bhor (Pune)
View ProjectTunnel, Shotcrete & Lining Works – Badhevadi, Wakurde L.I. Project, Tal. Shirala (Sangli)
View ProjectTunnel Concrete & Shotcrete – Wakurde L.I. Project, Tal. Shirala (Sangli)
View Project